Sammy II
2005 after the Makeover

in drydock.
List of items done

Replaced upper steering unit
designed and installed two 34 gallon saddle fuel tanks
reworked back deck and removed designed and replaced 220 gal. main fuel tank from steel to aluminum
added marine air conditioner to bridge installed
washdown jabsco and both main engine jabsco pumps all reworked
added two deck entry pop up hatches for entry to rudders and behind motors
main engine injectors removed and replaced with new pop test approved
sanded , prepped and masked off the entire boat from the waterline up and had painted with blue tone allgrip
also had all deck surfaces sprayed with nonskid allgrip
complete bottom job done including sanding repainting , zincs and used interlux primer and anti fouling on props.

all prep labor except the bottom performed by James and Samuel Battles. Money supplied for the endeavor by Samuel Battles. COST out of pocket was ALOT but since the owner of the marina was a friend it was made possible
but that would be with little or no help from a money grubbing manager that worked there. TJ  the manager attempted
to charge us the prep , masking and the painting charge when my brother and I had done all the work. I am pretty sure his job description has changed since the antics he pulled while we were on drydock.  Renting out ones slip while it was already paid for by that person and stalling their progress is pretty nasty along with many lies that were
told by this character.  
  Special thanks to Rick and his son e.g. Painter Glass professionals! They used  Blue Tone AllGrip Paint
  Excellent Choice of paint .
Drawings Main Tank
Damaged in shipping
Day tanks drawing and product delivered